Install the ledger between the rim joists and fasten it to the house with 3 inch decking screws.
Securing a deck to a house with i joist flooring.
To install the clip you drive a nail at an angle through the hole in the vertical neck of the clip and on through the decking and into the joist.
Attaching a deck ledger board to engineered floor joists floor truss systems are very different from conventional floor framing materials.
For wood decking using deck clips the first board is nailed or screwed to the joists as above.
If necessary create spacers by attaching pieces of decking to the top side of the frame that goes against the house.
The easiest way to do this is to remove the existing house rim joist and soffit and any insulation inside the cavities.
Dia galvanized or stainless steel lag screws in every other joist space alternating up and down positions to keep the ledger from splitting.
The problem with attaching a deck to a cantilevered floor is that there is nothing below the cantilever overhang to keep the rim joist at the house from pulling loose.
Deck ledgers cannot be attached to these i joists or nonstructural plywood rims.
Set the ends of the rim joists against the house and screw the l brackets into the sheathing.
If you don t want posts and a beam at the house side of the deck then you ll need to run the deck joists into the house floor joist system so the ends rest on top of a bearing wall or mudsill inside.
Like a roof truss floor trusses are created through joining standard lumber typically 2x3 or 2x4 with metal connectors.
There is no support below it.
Another nail ties the clip directly to the joist.
Predrill and sink 1 2 in.
A similar detail is available from wijma for when the i joists are oriented perpendicular to the rim joist.