You have made the necessary settings in customizing under production shop floor control integration process integration process messages.
Sap pp shop floor control configurations.
The objective of this paper is to provide the sap pp consultant with a step by step guides at configuring the sap pp shop floor control module.
Sap pp shop floor control configurations pp questions what is sap pp module sap pp questionnaire sap pp certification questions and answers requirement gathering user requirement mapping on sap production.
Opkp sap tcode for shop floor control profile here we would like to draw your attention to opkp transaction code in sap as we know it is being used in the sap pp sfc production orders pp component which is coming under pp module production planning opkp is a transaction code used for shop floor control profile in sap.
Pp pdc is an interface for shop floor control in sap erp or sap s 4hana.
It connects subsystems to download operations from production orders and upload time tickets and time events.
When the system chooses a routing recipe it pulls in routings recipes for the production order header material which is valid from the order start to order finish date and whose lot sizes matches with the production order quantity.
You have copied the standard messages for pp and pi under production shop floor control integration process integration standard settings adopt predefined message categories.
When you do the sap configuration sequence is not really important as long as all the pp shop floor.
A step by step guide to the sap pp shop floor control configurations generation of document link from material master on order release generation of document link from bom on order release specify that only 44.
Normally for sap pp you can choose the standard 01 selection id and for sap pppi you can choose the 02 selection id or create your own.
Shop floor control converts the planning data in material requirements planning into actual production orders and coordinates the production process with all the resources involved.
It is structure in the form of howto do configurations method.